Williams Lake School, British Columbia

  • case-williams-lake-school-1
  • case-williams-lake-school-2
  • case-williams-lake-school-3

This project for Williams Lake School, British Columbia, comprised a changeout of 13 pumps. The total pump energy usage dropped from 102,449 kwh to 29,608 kwh, a 71% reduction.
See the Case Study PDF